Friday, December 06, 2019
The skye times mobile

Road and rail links between Mallaig – Fort William have now been restored.

After a massive landslide late last week which brought 100 tonnes of mud and stones onto the roadway and rail lines normal travel is now possible.

Over the week-end traffic controls allowed vehicles to pass the affected section of the A830 but it was only today that rail services became fully operational.

Site created by Intermedia Services (Stornoway) Ltd © 2017